The work detailed in the Pump Station 207 and Force Main, Contract 12-23 contract drawings consists of the construction of a new pump station to replace the existing PS-207. Work includes approximately 100 Linear Feet (LF) of gravity sewer, construction of new pump station, building, odor control, electrical, communications, fencing, approximately 9,000 LF of force main, partial demolition of existing pump station, restoration of areas disturbed by construction, and all associated work.
↧