The work detailed in the Pump Station No. 23 Modifications, Contract 14-22 contract drawings consists of modifying and converting an existing wet pit/dry pit pump station to a conventional submersible pump station. Work includes bypass pumping, demolition, concrete testing and rehabilitation, converting the wet pit into a submersible pump wet well, converting the dry pit into a valve vault, electrical controls cabinet and diesel generator, all appurtenances, restoration of areas disturbed by construction, and all associated work.
↧