The work detailed in the Goslee Creek Regional Pump Station, Force Main, and Gravity Sewers contract drawings consists of the construction of the new Goslee Creek Regional Pump Station, approximately 4,500 LF of force main, and 6,000 LF of gravity sewer. The elements of work include but are not limited to the following: construction of a precast wetwell and valve vault with installation of new pumps, generator, control tower, and electrical control building.
↧