The work detailed in the ANSSD: Angola North Expansion- SR 24 Love Creek and Camp Arrowhead Road contract drawings consists of the construction of the new Angola North Pump Station, approximately 12,000 LF of force main, and 16,000 LF of gravity sewer, 2 duplex grinder pumps and 3 simplex grinder pumps. Work includes furnishing all equipment, material and labor for the work described in the bid document drawings and specifications.
↧